Portal de Mazarron

www.portaldemazarron.com

Mazarron - SpanishMazarron - English
detail of Mazarron

 

Town Hall athletics track conditions the municipal sports center (27/08/2010)

The Department of Infrastructure and Planning of the City of Mazarrón, coinciding with the summer season, is undertaking the refurbishment of the athletics track of the Polideportivo Municipal.

The works entail the execution of a synthetic floor 'in situ' in the tracks of 200 meters, the speed run, the street's long jump and high jump area, totaling about 1,800 square meters.

To do this, perform the ATMs through the existing tracks of earthy material and run a layer of gravel, two layers of asphalt and synthetic floor layer in situ.

The performance also includes the drainage of the duct perimeter tracks by 14 cm and driving buried PVC of 315 mm, the diversion of water pipes that run under the tracks and marking and marking of the tracks.

With this project, the Department of Infrastructure and Planning remodel some tracks very demands by the population and its main users: school children, local athletes and students of Mazarrón Athletic Club.

The amount of these works, awarded to the company Mazarron 'Coy S.L Francisco Building', is 130,124.70 plus VAT.

This project, funded by the Plan E, you are ready for your enjoyment later this year.

Source: Ayuntamiento de Mazarrón

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información