Last Monday started as normal the new 2013-2014 school year with 2,855 students distributed in schools in Mazarrón, Puerto and Cañada de Gallego.
Mazarrón Colleges of 1,520 students distributed grouped as follows: Francisco Caparros, 404 students, Ginés García, 226 students, the Flour mill, 210 students, La Canada, 247 students, Infanta Leonor, 433 students.
On the other hand, Puerto de Mazarrón this course has 1,177 students spread in college Manuela Romero (432), Bay (349), Miguel Delibes (170) and Siglo XXI (226).
Prior to the start of the course, the Department of Services and Logistics Mazarrón Town Council has made several works of maintenance, repair and improvements to all schools in the municipality.
The mayor of the area, Juan Miguel Muñoz, explained that "Infanta Leonor in school there have been various tasks of painting, masonry, plumbing, carpentry, electrical and gardening, highlighting the modification of the electrical installation according to the technical report to meet the regulations ".
In schools Francisco Caparros, Ginés García, the Flour mill and La Canada, like in school Infanta Leonor, "there have been numerous paint jobs, bricklaying, plumbing, carpentry, electrical and landscaping. Should be noted painting tasks nearly the whole school Francisco Caparros and bar placement for disabled and new tanks in toilets ".
It also highlights "the subjection of trames Ginés García at school and placing whiteboards at school the Flour mill and two siphons in the courtyard of La Canada" stated Muñoz.
In schools and Manuela Romero Bay of Puerto de Mazarrón "include mainly plumbing tasks. Bay at school have been repaired and drains sources inside and outside. Additionally, we have created stormwater downpipes in the gym. In Manuela Romero school have also been fixed sources and pipes large accumulations of lime. were also changed numerous sinks taps, "said Councilman Services.
Furthermore, as in all schools, have carried out tasks of painting, masonry, carpentry and electricity, highlighting the installation of whiteboards and digital projectors at school Bay.
Miguel Delibes The school has also been revised, repairing the main problems appeared recently in some of their infrastructure and have been resolved, as in the rest of the town, thanks to a thorough work and interest by the municipality.
As for the schools in the districts of Mazarrón included the placement of a swing, the replacement of a full bathroom and exterior repair streetlights at the Colegio San Antonio de Cañada de Gallego.
In schools Watchtower (with 7 students) and Pastrana (with 5 students) emphasizes the replacement of tanks and other improvements in the toilets, and other improvements painting, carpentry, electrical and gardening both in schools and in the previous school Leiva (13 students).
In Gañuelas are registered 5 remaining students.
The Mayor of Mazarrón, Ginés Campillo, highlighted "the work and effort of the Department of Services for debugging schools for the start of the new school year."
The mayor wanted to emphasize that "all these improvements, which have been many and very important, we have undertaken with funding from the municipal coffers, surpassing an investment of more than 100,000 euros."
To Ginés Campillo "has done a very great improvement in the quality of education in Mazarrón, thanks to good economic management we are rushing to the front of the municipality. Missing Only the Autonomous Community of the Region of Murcia perform an effort similar fix whatever is your direct competition, such as the school wall Francisco Caparros. Acting claimed that spend time, "she added Ginés Campillo.
Source: Ayuntamiento de Mazarrón