Portal de Mazarron

www.portaldemazarron.com

Mazarron - SpanishMazarron - English
detail of Mazarron

 

Conditioner access to the college of Cañada de Gallego and renewed the drinking water (11/01/2016)

The College of Education and Primary San Antonio Cañada de Gallego has renewed access by performing two lanes for entry and exit of buses, with a total width of six meters.

The work started in December also included the extension of sidewalks in front of the school and parking in the band, thus fulfilling the law of accessibility, favoring also the comfort of students and parents.

The works have been awarded by the City of Mazarrón Jeamar 2009 the company worth 51,804 euros also involve the renewal of the drinking water at school, soccer field, attached homes and irrigation network.

To do this we proceeded to the installation of polyethylene pipe valve manholes cutting.

It has also carried out the pre-installation of street lighting, installation of sidewalks and paved with terrazzo.

Source: Ayuntamiento de Mazarrón

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información